Text/HTML
Login
Menu
Collections
About
Submit
FAQs
Search Open/Close
Open/Close Header Details
Search
other
Menu Open/Close
NOAA In Space
Other
NOAA In Space
Satellite Operations Control Center (SOCC) Controller James Budd at TIROS-NController's console, from which two operational TIROS-N type spacecraft arecontrolled.
Download
.jpg
(906.98 KB)
Satellite Operations Control Center (SOCC) shift supervisor Jim Nichols at theTIROS-N Spacecraft Engineer's Console.
Download
.jpg
(961.45 KB)
Scientist Frank Porto at the tape drives of the then new National EnvironmentalSatellite Service (NESS) mass data storage system, the SDC TBMII. This systemwas used to archive all of the TIROS-N and NOAA-6 digital data on standard two-inch video tap
Download
.jpg
(898.99 KB)
Scientist Frank Porto at the tape drives of the then new National EnvironmentalSatellite Service (NESS) mass data storage system, the SDC TBMII. This systemwas used to archive all of the TIROS-N and NOAA-6 digital data on standard two-inch video tap
Download
.jpg
(882.37 KB)
Electronic equipment at the Wallops Island CDA.
Download
.jpg
(1.25 MB)
An Automatic Picture Transmission recorder which received data from TIROSsatellites and printed out as images of cloud cover. The system could alsoreceive standard weather maps.
Download
.jpg
(650.94 KB)
ESSA 9 lifts off on Delta Launch Vehicle 67. Pre-launch designated TOS G.
Download
.jpg
(906.17 KB)
GOES-1, Geostationary Operational Environmental Satellite-1, lifts offaboard Delta Launch Vehicle 116.
Download
.jpg
(1.5 MB)
GOES-F launching into orbit. GOES-F was designated GOES-6 after attainingorbit.
Download
.jpg
(976.06 KB)
Graphic of GOES-I, the first of the GOES-NEXT spacecraft became GOES 8after a successful launch on April 13, 1994.
Download
.jpg
(1.72 MB)
Graphic of GOES-I-M, the present generation of GOES-NEXT satellites.
Download
.jpg
(1.39 MB)
Working on ESSA-7, designated TOS-E prior to launch. Satellite was launchedAugust 16, 1968.
Download
.jpg
(1015.94 KB)
ESSA-9, designated TOS-G prior to launch, shown during final checkout prior tobeing placed aboard launch vehicle. ESSA-9 was launched February 26, 1969, at0247 A.M.
Download
.jpg
(789.07 KB)
Graphic of ITOS system data flow.
Download
.jpg
(1.05 MB)
Graphic of overall ITOS system.
Download
.jpg
(1.29 MB)
GOES-A, the first operational Geostationary Orbiting Environmental Satellite,being prepared for launch. GOES-A was redesignated GOES-1 following launch onOctober 16, 1975.
Download
.jpg
(1.02 MB)
An early GOES satellite.
Download
.jpg
(1.25 MB)
GOES-A undergoes checks at Aeronutronic Ford facility.
Download
.jpg
(998.91 KB)
Working on ESSA-5 prior to launch.
Download
.jpg
(1.05 MB)
Infrared imagery of the Loop Current in the Gulf of Mexico and the Gulf Stream.Lighter colors north of Florida Panhandle indicate extent of cold air swoopingdown from the north behind a cold front. Clouds in upper right corner show very cold tops (l
Download
.jpg
(957.65 KB)
First
Previous
2
3
4
5
6
Next
Last
Enter Title
Back To Top